mainlogo2.jpg (11011 bytes)

HEADLINES

logo1.jpg (7522 bytes)

tkphead2.jpg (5702 bytes)
 Kathmandu Saturday April 28, 2001 Baishakh 15,  2058.


Traffic resumes on Prithvi Highway

Post Report

CHITWAN, April 27- Traffic resumed on the Prithvi Highway at 11 AM, Friday, after a 17-hour interruption following landslides in three different sites triggered by massive rainfalls on Wednesday and Thursday.

Vehicles to and from the capital were stranded along the highway when the early monsoon rains brought about landslides at a place 3 kms east of Mugling, Fishling and Krishnabhir.

Vehicular transport continued when heavy equipment from the Divisional Road Office at Bharatpur were able to remove the mounds of landmass, an engineer at the Divisional Office, Tulasi Prasad Sitaula, said.

The removal of the heaps of fresh landslides was delayed due to the vehicular traffic jam, which extended to several kilometres.


Other Stories


|Editorial| |Local| |Economy| |Letter| |Sports| |Past|

Send your comments and letters to the editor at kanti@kpost.mos.com.np
2001 © Mercantile Communications Pvt. Ltd. P.O. Box 876, Durbar Marg, Kathmandu, NEPAL. Tel : 977 1 220 773, 243566, Fax: 977 1 225 407. Reproduction in any form is prohibited without prior permission. No part of the articles which appear in the internet version on The Kathmandu Post may be reproduced without the permission of Mercantile Communications Pvt. Ltd. For reprinting rights, please write to US. Send us your feedback: CONTACT US  ABOUT US  HOME ADVERTISE WITH US

BACK TO THE TOP